Nuns’ Island Bridge – Dismantling of Bracing Structures

PROJECT DETAILS

Type: Temporary Structures

Category: Lifting

Date: 2017

Client: Signature sur le Saint-Laurent (SSL)

Location: Nuns’ Island Bridge

Nuns’ Island Bridge – Dismantling of temporary bracing structures

Design of temporary structures for formwork and dismantling of temporary bracing structures.

  • Design of a wooden work platform with a length of over 450 meters
  • Development of a demolition procedure
  • Design of temporary aluminum gantry cranes
  • Design of lifting jibs and transport trolleys