Field Engineering for the New Champlain Bridge

PROJECT DETAILS

Category: Temporary Structure

Date: 2016-2018

Client: Signature sur le Saint-Laurent (SSL)

Location: New Champlain Bridge Corridor

Lien: http://cys-ing.com/ouvrages-temporaires/

DESCRIPTION

Design of a significant portion of the temporary structures for the entire construction of the New Champlain Bridge Corridor.

The types of temporary structures designed by CYS Experts-Conseils are as follows:

  • Formwork
  • Work Platforms
  • Lifting plans
  • Superstructure Shoring
  • Earth Retaining
  • Temporary Shoring
  • Work Procedures